{"id":4251,"date":"2023-06-16T11:13:20","date_gmt":"2023-06-16T11:13:20","guid":{"rendered":"https:\/\/kymayacht.com\/?p=4251"},"modified":"2024-07-01T08:22:17","modified_gmt":"2024-07-01T08:22:17","slug":"the-crn-m-y-143-project-maranello","status":"publish","type":"post","link":"https:\/\/kymayacht.com\/en\/blog\/the-crn-m-y-143-project-maranello\/","title":{"rendered":"The CRN M\/Y 143-Project Maranello"},"content":{"rendered":"\n<p>The CRN M\/Y 143-Project Maranello, also the result of Kyma\u2019s expertise, is coming to life in the Ferretti Group shipyards in Ancona.<\/p>\n\n\n\n<p><strong>The CRN M\/Y 143-Project Maranello<\/strong><\/p>\n\n\n\n<p>The 67-metre steel hull and aluminium superstructure combine in a fully tailored design in both design and construction. The megayacht, as stated in the CRN press release, <em>&#8220;will have 5 decks and will accommodate up to 14 guests and 17 crew in exceptional comfort<\/em>.&#8221;<\/p>\n\n\n\n<p>As for form and aesthetics, the megayacht is characterized by <em>\u201ctaut, fluid, aerodynamic lines and a potent sense of style that fully reflects her owner\u2019s vision and specifications.\u201d <\/em>This spectacular project by CRN, which includes the brokerage house of Moran Yacht&amp;Ship to represent the owner, can boast of the creativity and experience of Nuvolari Lenard for Exterior design.<\/p>\n\n\n\n<p><strong>The hybrid propulsion<\/strong><\/p>\n\n\n\n<p>But the 67 meters in addition to craftsmanship, style and aesthetics is also innovation and attention to the environment: The characterizing element of the 143-Project Maranello, is engine that will lead to the creation of <em>\u201can innovative, eco-friendly custom pleasure vessel with a state-of-the-art hybrid-propulsion&nbsp;system for enhanced energy efficiency and significantly improved fuel economy.\u201d<\/em><\/p>\n\n\n\n<p><strong>Kyma\u2019s role in CRN Hull 143 Maranello<\/strong><\/p>\n\n\n\n<p>For this innovative and compelling project, Kyma has used its skills and abilities to study the structures, the installations and the equipment.<\/p>\n\n\n\n<p>In detail: for the structures part, Kyma has developed the scantling plan with the relative <a href=\"https:\/\/kymayacht.com\/en\/services\/basic-engineering\/#fem\" target=\"_blank\" rel=\"noreferrer noopener\">FEM analysis<\/a> and the <a href=\"https:\/\/kymayacht.com\/en\/services\/nesting\/\" target=\"_blank\" rel=\"noreferrer noopener\">nesting<\/a> documentation.<\/p>\n\n\n\n<p>For the plant part Kyma has made the piping coordinated drawings of the whole boat.<\/p>\n\n\n\n<p>In addition to the structures and plants Kyma has realized many <a href=\"https:\/\/kymayacht.com\/en\/services\/naval-outfitting\/\" target=\"_blank\" rel=\"noreferrer noopener\">fitting-out<\/a>, activities that for this project was carried out in the offices of Follonica (GR) but that for the future Kyma will develop in the next opening in Marina di Massa (MS). <\/p>\n\n\n\n<div class=\"wp-block-columns is-layout-flex wp-container-core-columns-is-layout-9d6595d7 wp-block-columns-is-layout-flex\">\n<div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\" style=\"flex-basis:100%\">\n<p><iframe title=\"Megayacht CRN M\/Y 143-Project Maranello: la movimentazione dello scafo \u00e8 uno spettacolo\" width=\"500\" height=\"281\" src=\"https:\/\/www.youtube.com\/embed\/cnHElbHPyPs?feature=oembed\" frameborder=\"0\" allow=\"accelerometer; autoplay; clipboard-write; encrypted-media; gyroscope; picture-in-picture; web-share\" referrerpolicy=\"strict-origin-when-cross-origin\" allowfullscreen><\/iframe><\/p>\n\n\n\n<p>CRN&#8217;s press release: <a href=\"https:\/\/www.crn-yacht.com\/en-us\/News-and-events\/Detail\/t\/CRN-MY-143Project-Maranello-the-new-67metre\/n\/2183\" target=\"_blank\" rel=\"noreferrer noopener\">https:\/\/www.crn-yacht.com\/en-us\/News-and-events\/Detail\/t\/CRN-MY-143Project-Maranello-the-new-67metre\/n\/2183<\/a><\/p>\n<\/div>\n<\/div>\n\n\n<p><!-- \/wp:post-content --><\/p>\n<p><!-- wp:paragraph --><\/p>\n<p><\/p>\n<p><!-- \/wp:paragraph --><\/p>","protected":false},"excerpt":{"rendered":"<p>The CRN M\/Y 143-Project Maranello, also the result of Kyma\u2019s expertise, is coming to life in the Ferretti Group shipyards in Ancona.<\/p>\n","protected":false},"author":786,"featured_media":4273,"comment_status":"closed","ping_status":"closed","sticky":true,"template":"","format":"standard","meta":{"footnotes":""},"categories":[100],"tags":[317,101,318,306,125,110,321,450,654,152,344,116],"class_list":["post-4251","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-works-2","tag-143-2","tag-3d-2","tag-67-2","tag-ancona-2","tag-boat-en","tag-kyma-2","tag-megayacht-2","tag-outfitting","tag-projectmaranello","tag-technology","tag-tuscany-en","tag-yacht-2"],"_links":{"self":[{"href":"https:\/\/kymayacht.com\/en\/wp-json\/wp\/v2\/posts\/4251","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/kymayacht.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/kymayacht.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/kymayacht.com\/en\/wp-json\/wp\/v2\/users\/786"}],"replies":[{"embeddable":true,"href":"https:\/\/kymayacht.com\/en\/wp-json\/wp\/v2\/comments?post=4251"}],"version-history":[{"count":12,"href":"https:\/\/kymayacht.com\/en\/wp-json\/wp\/v2\/posts\/4251\/revisions"}],"predecessor-version":[{"id":4301,"href":"https:\/\/kymayacht.com\/en\/wp-json\/wp\/v2\/posts\/4251\/revisions\/4301"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/kymayacht.com\/en\/wp-json\/wp\/v2\/media\/4273"}],"wp:attachment":[{"href":"https:\/\/kymayacht.com\/en\/wp-json\/wp\/v2\/media?parent=4251"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/kymayacht.com\/en\/wp-json\/wp\/v2\/categories?post=4251"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/kymayacht.com\/en\/wp-json\/wp\/v2\/tags?post=4251"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}